Difference between revisions of "How to electrocute an elephant 5"

From Whitespace (Hackerspace Gent)
Jump to: navigation, search
m (What got done)
 
Line 20: Line 20:
 
== What got done ==
 
== What got done ==
 
The front room and back room are now on two separate nets, all nicely connected with tubes.
 
The front room and back room are now on two separate nets, all nicely connected with tubes.
 +
 
Next up: completion of the centerbeam-net and rerouting of the roof circuit in the back room.
 
Next up: completion of the centerbeam-net and rerouting of the roof circuit in the back room.
  

Latest revision as of 17:14, 4 June 2011

Note: this article is about a passed event.

How to electrocute an elephant 5
WhitespaceLogo.gif
From 2011/06/04 14:00:00 to 2011/06/04 23:59:59
Attendees (2):
Koenraad, Koen
Where:
Whitespace Blekerijstraat 75, Gent, Belgium
Loading map...

Costs 0

Cornify

«Upgrading the electricity, getting electrocuted»

"Unknown" is not in the list of possible values (Meeting, Workshop, Talk, Slacking, Conference, Hacking) for this property.

Back to the future doc connecting power.jpg

Last time we started redoing the wiring of the space. Let's continue! And integrate Spacecontrol! Please come over, even if you don't know anything about electricity. An extra pair of hands is always welcome!

TODO[edit]

  • Lay new wiring, install extra power connections.
  • Hook up the lights and roof to Spacecontrol
  • Transfer drawings from whiteboard photographs to paper

What got done[edit]

The front room and back room are now on two separate nets, all nicely connected with tubes.

Next up: completion of the centerbeam-net and rerouting of the roof circuit in the back room.

References[edit]

Documents explaining the AREI (Algemeen Reglement op de Elektrische Installaties):

Testing:

Subpages

"" has no sub pages.


Historical data can not be displayed in a Factbox